Commissioning
Critical Systems Commissioning Levels 1-5:
Level 1: Factory Witness Testing
Level 2: Site Acceptance Inspection
Level 3: Pre-Functional Testing
Level 4: Functional Performance Testing
Level 5: Integrated Systems Testing (IST)
Retro-Commissioning
Building Commissioning and Validation
Electrical Cx
Power Quality Studies
Transformer
IEEE Battery Testing
Uninterruptible Power Supply (UPS)
Static Transfer Switch (STS)
Power Distribution Unit (PDU)
Generator Testing
Automatic Transfer Switch (ATS)
Medium and Low Voltage Switchboard/Switchgear
DC Plant and BDCBB/BDFB
Panelboard
Operations Support
Emergency Operating Procedures (EOP)
Standard Operating Procedures (SOP)
Method of Procedures (MOP)
Root Cause Analysis and Corrective Actions
Short Circuit Coordination and Arc Flash Studies
Single Line Surveys
Spare Parts Inventory
Operations and Maintenance Programs
Mechcanical CX
Chiller Systems
Cooling Towers
Thermal Energy Storage Systems
Variable-Primary and Primary-Secondary Pumping Systems
Dry Coolers
Heat Exchangers
Boilers
Air Handling Units (AHU)
Dedicated Outdoor Air Systems (DOAS)
Variable Refrigerant Flow (VRF) Systems
Rooftop Units (RTU)
VAV/CAV Terminal Units
Temperature/Humidity Control Systems
NETA Testing
Infrared Scanning
Insulation Resistance Testing
Contact Resistance Testing
Medium and Low Voltage Transformer Testing
Meter Verifications
Primary & Secondary Injection Circuit Breaker Testing
Medium Voltage Relay Programming and Testing
Primary & Secondary Injection Circuit Breaker Testing
Mission Critical Support
Integrated Systems Testing (IST) and Script
BAS/EPMS Controls Operation Verification
Chilled Water Plant Performance Testing
Cooling Capacity and Redundancy Assessment
Energy Modeling
Life Cycle Cost Analysis for Energy Conservation Measures